CarvoltX

Tools

EV charging time calculator

Pick an EV or PHEV from the Pakistan catalogue to auto-fill battery size, or enter a custom pack and charger power. Set start and target charge levels to estimate time at AC or DC rates. Results are planning sketches based on the numbers you enter, not a promise of real-world charge time.

75 EV / PHEV models from the live catalogue (61 with battery data).

Charger power

Default 50 PKR/kWh. Change this to match your home tariff or public charger rate.

Estimated charging time

-

PKR -

Energy to add
-
Grid energy (90%)
-
Charging cost
-
Rate used
-
Effective charge rate
-
From → to
-
Charger
-
Battery used
-

Cost uses energy drawn from the grid (battery energy ÷ 90% efficiency) × your PKR/kWh rate. Real times and bills vary with heat, cable limits, onboard AC max, and charge curve above ~80%.

How charging time is estimated

Energy needed is battery capacity times the gap between current and target charge. Time divides that by charger power after 90% efficiency. Cost multiplies grid energy by your PKR/kWh rate.

Catalogue cars

The vehicle list is loaded live from cars tagged EV or PHEV (including fuel type). New plug-in models appear here when added to the database.

Time + cost

Set your electricity rate (default 50 PKR/kWh). Cost uses grid energy, so charging losses at 90% efficiency are included.

Power presets

Use home AC through DC fast presets, or type any kW value. Times are estimates, not OEM charge curves.